Careys delivered concrete works at 22 Bishopsgate, London’s second tallest building, using a self-erecting jumpform syst...
Careys were awarded the contact to carry out the premium installation of landscaping for the state-of-the-art Tottenham ...
The V&A Dundee located on the River Tay, is one of the most prestigious and challenging projects awarded in the £1 billi...
Careys are proud to have been awarded a Design and Build Contract and subsequently appointed as Principal Contractor for...
Careys was originally appointed principal contractor for the early phases by Sirius Minerals, which was subsequently ac...
The Careys team was responsible for the successful delivery of all substructure works – including the three-level baseme...
The Flight Connection Facility (FCC) was a business-critical project for Heathrow Airport, undertaken within the footpri...
Careys are constructing impressive new facilities and infrastructure at the University of Glasgow campus, carrying out f...
Careys have been successful in securing another Reinforced Concrete Frame project in the city of Birmingham. The concret...
Careys were appointed to carry out the construction of the basement slab and underslab drainage at the distinctive new M...
Careys were appointed at tender stage to develop the strategy for the construction of the 50-storey Principal Place towe...
Careys delivered an extensive package of hard and soft landscaping works at the prestigious venue of Wimbledon Tennis Co...
Careys has been on-site at Elephant & Castle since November 2014 and has been awarded numerous contracts which include h...
Careys were appointed principal contractor for the project to demolish and remediate the former Ford Dagenham Stamping a...
As part of the larger project to redevelop the Nine Elms area of London, our design team was presented with the client's...
Careys were contracted for the civils and infrastructure works at The Exhibition Complex Aberdeen. Our works include the...
Careys was appointed as the Civil Balance Of Plant (CBOP) contractor to construct Bruckana Wind Farm which spans 678 hec...
The Edinburgh Airport Extension – Phase 1 is part of an £80 million, 14,700m2 terminal expansion to Edinburgh Airport is...
Careys were appointed specialist subcontractor at Keadby 2 Power Station in Lincolnshire where our team were responsible...
Careys were awarded the substructure package for the World Conservation and Exhibitions Centre (WCEC) project, which ent...
Careys was appointed to undertake the construction of a four-storey below ground energy centre just north of the iconic ...
Careys was awarded a superstructure and substructure packages of works at this EfW facility. These included constructing...
Careys are delivering groundworks and superstructure works, for principal contractor, Lendlease, on behalf of client, Ur...
Careys was contracted to partially demolish the structures at Coal Drops Yard, adjacent to King’s Cross Station, London....
Careys has a long-standing relationship with Sainsbury's Supermarkets, which dates back to 1989, when we first began pro...
Careys was awarded a series of specialist work packages over 81 weeks at the Royal Opera House in London’s West End as p...
Careys was awarded works for four superstructure buildings which will compromise an urban gallery, commercial spaces, re...
Careys was contracted to deliver the enabling, infrastructure, utilities, landscaping and public realm works at this 150...
Careys were appointed principal contractor by AELTC, which runs the famed Wimbledon tennis championships, to deliver 16 ...
Careys were awarded a contract by Edinburgh Airport Ltd (EAL) for the Stands Development, Phases 2A and 2B. The 42-week...
Careys were commissioned to carry out a facelift of hard landscaping, construction of a service yard surfacing of the Ev...
Careys was awarded an enabling package of works on the project to transform the former Lostock Power Station in Northwic...
Careys was contracted to complete a range of landscaping and groundworks that included hard and soft landscaping, instal...
Careys were appointed for the supply, installation, testing and commissioning of the storm water drainage, pit and duct ...
Careys were awarded a 66-week contract to carry out an extensive substructure and superstructure package of works to del...
Careys were initially appointed as Principal Contractor for an enabling works package, before receiving a second package...
The Theatre Royal Drury Lane is Grade I listed building West End theatre in Covent Garden, London. Careys was contracted...
Careys were contracted to undertake a prestigious cut and carve package including significant alterations, alongside gro...
Careys were awarded the contract to carry out external works at Pfizer’s Head Office in Walton Oaks, Surrey.
During pre-construction planning, our n-house design team developed a detailed logistics plan to overcome the constraint...
Careys delivered the hard landscaping elements of the redevelopment of St Bartholomew’s Hospital in central London. Work...
Careys helped to build the Millerhill Energy from Waste (EfW) plant, which plays a key role in Edinburgh’s “Zero Waste” ...
Careys delivered a package of enabling, infrastructure, substructure and superstructure works – one rises to 10 storeys ...
Careys were appointed to carry out earthworks, the basement box substantial reinforced concrete works and diaphragm wate...
Careys undertook testing on existing concrete foundations at Heathrow Airport to check their suitability to support new,...
Careys were awarded the contract to build an Energy Recovery Facility at Dunbar, East Lothian. Our works included the co...
Careys were awarded the design and build package for the hard and soft landscaping at Ware, consisting of block paved an...
Careys were awarded a contract to construct seven buildings to house new recycling equipment and waste sorting facilitie...
On the Grousemount Wind farm project we are responsible for constructing 38 wind turbines, building approximately 26km o...
Careys were appointed by Siemens to carry out the concrete works package for the 842 megawatt Combined Cycle Gas Turbine...
Careys was the Civil Balance of Plant (CBOP) design and build contractor for the Mount Lucas Wind Farm project on a Bord...
Careys were contracted to undertake the construction of a new NHS Emergency Care Centre in Aberdeen, comprising an eight...
Careys were awarded various packages at Wick Community Campus in the north of Scotland to construct an entirely new high...
Careys delivered the top-down excavation of a basement and the construction of two superstructures of seven- and 18-stor...
Careys were contracted to divert live services and reposition infrastructure to enable the extension of the current carg...
In our role as principal contractor on this 12-week design and build contract, Careys was responsible for the civil engi...
Careys were contracted to construct a new high school in Oban. Our team undertook site enabling works, construction of f...
On this project the Careys team were responsible for the 70,000m3 bulk earthworks excavation, followed by lime stabilisa...
This project required the Careys team to replace a number of live airside roadways, comprising of the replacement of pav...
Careys was awarded the design and build contract to construct a precast encapsulation structure over the existing Dockla...
Careys undertook civil engineering works on a salmon fish hatchery comprising a portal steel frame, where we installed t...
Careys completed construction of the substructure and superstructure of a new school and student accommodation in the re...
Careys was principal contractor on this earthworks contract in Selly Oak, Birmingham. Forming part of a wider regenerati...
Careys initial works on this project involved groundworks to accommodate a 16,0000m2 extension to the existing building....
Careys are proud to have taken part in the construction of a new primary school, secondary school and sports block for J...
Careys was contracted to undertake works on a salmon food production facility consisting of multiple buildings located w...
Careys was awarded the contract to undertake construction of a 250m long Reinforced Concrete viaduct as part of the Dock...
Careys was contracted to deliver external and drainage works at Garrison Data Centre – a 50-acre data centre campus. As...
Careys undertook a major package of civil engineering, infrastructure and high quality hard landscaping works on this pr...
As part of Telehouse’s planned move to its Docklands campus, at the time reputed to be Europe’s most advanced data centr...
Careys was contracted to carry out the cut and carve demolition of the seven-storey Old Pavilions Shopping Centre, situa...
Careys was appointed as principal contractor for this development which consisted of a new two storey modular commercial...
Careys was awarded a package of soft strip, facade retention and deconstruction works to provide an integrated solution ...
Careys initial scope of works included delivering a main access road and the construction of a buried foul water pumping...
Careys were principal contractor on the Graven Hill project, delivering various construction and civil engineering packa...
Careys successfully delivered works at Kings Gate House which formed part of the larger regeneration of Victoria. Our t...
Careys has been awarded a package of works at Springside in Edinburgh to deliver a seven storey post tension frame with ...
For the construction of a new library, our team completed the ground floor slab, concrete cores, retaining walls and sus...
Careys were awarded a package of works at Vauxhall’s van plant as principal contractor on the bespoke design and build c...
In line with our high-quality standards, Careys is delivering substructure and superstructure works at Potato Wharf in M...
22 Bishopsgate is a 68 storey building over an existing basement and core structure. Careys in-house design team was app...
Careys were awarded multiple packages at the Principal Place residential scheme in Shoreditch, London. Our works involve...
The £80 million Watermark West Quay development in Southampton, which includes the West Quay shopping centre, also invol...
Careys was awarded a design and build contract to convert an old House of Fraser outlet in the Highcross Shopping Centre...
As part of our extensive package of works at Telehouse, Careys were initially contracted to carry out enabling works on ...
Careys have secured three packages of work under the P22 Framework at the Milton Keynes University Hospital. The packag...
Watford Riverwell project, where our teams significantly increased reusable volumes of excavated spoil by careful remedi...
Careys delivered works on an ambitious design and build contract in Wellesley, Aldershot, including a full civils packag...
The Garnock Academy Campus merged a primary school and nursery with the new look academy and leisure centre, accommodati...
Careys was contracted to act as principal contractor and significant contributor on crucial stages of the project to cre...
Careys have delivered the conversion of the existing British Home Stores into a Primark store at the Oracle Shopping Cen...
Careys were appointed principal contractor on an extensive package of riverside landscaping works in Reading, comprising...
Careys was contracted to deliver the breakthrough of the existing Westfield Shopping Centre into the new development as ...
Careys undertook works as a specialist contractor on a new learning and teaching centre for Newcastle University. Our wo...
Careys teams have delivered numerous packages of demolition, structural alterations and civil engineering based works at...
Careys were awarded a contract to carry out an extensive package of works at the live RAF Lossiemouth airbase in Moray, ...
Careys was appointed to work on City Park 1; a new, high-quality commercial development. Our team was responsible for th...
Careys completed the design and build of two sub and superstructures, infrastructure works and hard landscaping at the I...
Our in-house design team was appointed at tender stage to produce a 4D model to simulate the construction sequence of th...
As part of the landmark redevelopment of the Victoria area of London, Careys and our sister company, BDL, were contracte...
Careys was awarded this sub and superstructure package to construct an office and retail development in central Glasgow....
Careys was awarded a package of works for the asbestos removal, demolition and enabling works at the Johnson Matthey 3CR...
Careys delivered a complex temporary works design for the basement expansion at Rathbone Square in London. The complexit...
Following previous work on site - the construction of the four-storey basement box destined to house the development’s m...
Careys was contracted by the Mayor of London’s London Legacy Development Corporation (LLDC), to deliver the infrastructu...
Careys was contracted to deliver a significant enabling, demolition and structural alteration package as part of an offi...
Careys have been involved in the construction of a new energy from waste (EfW) plant, Slough Multifuel for client Scotti...
Careys were awarded a utilities and design and build infrastructure package at the Perry Barr Residential Scheme (PBRS) ...
The 2022 Championship marked 100 years of Centre Court in its current location at Church Road in Wimbledon and AELTC com...
Careys delivered a four block residential scheme, comprising demolition, enabling, basement and superstructure words for...
In June 2022, Careys commenced the delivery of the £21.5m Westfield EfW project for Hitachi Zosen Inova (HZI). It will r...
The Embankment Exchange Manchester scheme will deliver 300 high-end residential properties, commercial units and a gym ...
Careys was engaged by principal contractor Mace to undertake the enabling and substructure works at the Science Technol...
Careys has successfully delivered the contract for three new water treatment tanks at the historic Invercannie Water Tre...
Careys was awarded an enabling package of works at the Kelvin Energy Recovery Facility (ERF) in West Bromwich, West Midl...
The new infrastructure project will be built on the site of the former Skelton Grange Electricity Works, which were deco...
Scheduled to open in 2024, the Life Sciences Innovation Hub is a new 4,000m2 medicine research laboratory located on bro...
Careys is delivering substructure, superstructures drainage and ducting and hard landscaping works at the Viking Link, t...
W06 Wembley Park is made up of two buildings, one residential and the other is a commercial space.
Careys is close to completing the first phase of its contract for the construction of a crucial continuity waste treatm...
Careys is delighted to be a preferred partner for Sainsburys working on multiple nationwide installations of ‘Smart Char...
Careys have been contracted by Siemens to deliver a series of enabling works - earthworks, drainage and roadworks, and m...
Careys were awarded the enabling works, drainage, substructure, superstructure and hard landscaping packages on the pro...
Careys is currently in the early stages of a contract on an important new high school project located in the Scottish Bo...
The Project V development near Blyth, Northumberland will create a 46,000m2 subsea cable factory to support the growth ...
Careys were contracted to undertake works on the new Learning and Teaching building for the University of Glasgow, rec...
Careys has been awarded a package of works at Springside in Edinburgh, the residential development comprised of studio a...
Construction of a new state of the art Energy Centre. This facility will house the usual components such as a Waste Bunk...
In 2023, EAL appointed Careys to undertake the high risk delivery of new fixed electrical ground power units (FEGP) at...
Careys were awarded this prestigious project as part of the Group’s Olympic Games works. The overarching aim was to make...
We'd love to hear from you, so please get in touch